Kawasaki & IMS has successfully completed a series of gas turbines and co-generation and related hardware EPCs and has been actively expanding its business such as co-generation systems, and driving units of machinery.
We Provide
- Packaged Solution by KAWASAKI Gas Turbine + Heat Recovery Boilers + Chillers
- Cogeneration by using primary fuel and provide +85 % efficiency
- CO2 Reduction Rate is 48 %
- KAWASAKI Offers guarantee and performance bond on efficiencies
- KAWASAKI & IMS One Window Solutions for EP or EPC or EPC + F Construction Modes.
- IP 54 Enclosure Multistage Sounds & vibrations and is Very Compact. Does not need Housing.
- Ready Made Packages for 4 MW, 10 Tons Steam and 6 MW, 6 Ton Steam, 8 Month Delivery
- Japanese Built and Assembled
- Maintenance and Efficiencies staff are available 24/7
- Supply, Commissioning, Operation and Maintenance.
Cogeneration vs Conventional
ADVANTAGES
- One Manufacturer Provides Cogen-Efficiency
- Performance Bond Can be End-Cashed if full Performance is not delivered.
- Quality Ensured
- Seamless Execution of Project. On-Time, Every Time
- Civil Cost Reduced. Low Footprint, No Large Engine
Room Required
- Fully Trained Staff Available 24/7
- Fully Equipped with all major and Auxiliaries
- No Major Variation in Efficiency at All Temperatures
Cogeneration